Monday, September 7, 2015

Lots Of Work And Time To Do It

Since we sold our Gilbert house in May, most of Laurie's time has been spent at the Payson house.  Our plans are for Mike to come up for three weekends of the month (two of his 3-day weekends and one other) and then Laurie will go down to Chandler for the other weekend.  She can expand the weekend by a few days to handle doctors appts, shopping and other things she cannot do in Payson.  Since our last post, Mike had a lot of work to do to prep for another trip to Hawaii and then was gone for two weeks.  During this time, Laurie sorted through garage sale items and finished organizing the house.

We had plans for our group of MRKLUD friends to come up for the Labor Day weekend.  In past years we scheduled this get-together on the 4th of July, but this year we decided to move it to Labor Day because (1) it is always a 3-day weekend, (2) it would be cooler than July, and (3) two of the couples had other possible family plans for the 4th of July in 2015 that could not be changed.  To be sure we would be ready for our guests, Mike decided to take the week off after returning from his work trip and before Labor Day to help get the house in shape.  Once he made plans to take this time off, Laurie started a list of items for him to take care of that week.  We came up on a Sunday night after a great lunch with friends and the work began.

Due to all the hours Mike had been putting in at work and the long trip, we did not push our days very hard.  We spent quite a bit of time relaxing and enjoying being together, but managed to get a project or two done each day.  Mike started with some simple tasks of making new shelves for the kitchen armoire and adding two new racks to hold ziploc boxes.  The new armoire we put in over a year ago did not have enough shelving to hold all our dishes and Mike was worried that putting too much weight on a shelf could become a problem.  Laurie tried to optimize the space by using wire shelving, but the weight was still an issue and the wire racks were too wobbly.  So we found shelves at Home Depot which were similar in both color and depth, they just needed to be cut to size.  Mike used his table saw to shorten the three extra shelves and, using extra pegs we bought, installed them.  Laurie re-arranged the items and it works much better now. Then it was just a few screws to install two wire racks, one inside a lower cabinet and another on the side of the microwave hutch. These will hold about 6-7 boxes leaving extra space on shelves.

First project of the week, more shelves
When our plumbing work was done in 2010, a new line was run to the outside hose bib out of the crawlspace, under the deck and through the deck joist.  After the deck was rebuilt, we never reattached this line and it has just been hanging underneath the deck.  Instead of compromising the integrity of the new deck structure by drilling holes in the joists, Mike decided to mount the plumbing to the underside of the joists.  Now that the deck was wider, he had to get a sharkbite coupler and add some plex pipe to reach the deck edge.  He used some of the leftover deck material and built a holder for the bib which connected to the outside deck joist.  He still needs to add insulation to this external, unprotected pipe so it won't crack when it gets colder.

Extended hose bib connection and attached to deck joists
Did not have a bracket to attach hose bib to deck, so made one from decking material
Another item that was affected by the deck rebuild was the gutter across the back of the kitchen roof.  The downspout on this gutter had been installed at the edge of the original deck and that edge was now in a different place.  We either needed to cut a hole through the deck to allow the downspout to stay in its place or redo the whole gutter and place the downspout at the other end.  Neither were great choices.  Laurie came up with the idea of running the existing downspout into a rain barrel, which would be placed out of the way on the concrete deck, and we started researching that option.  However, we learned that asphalt roof runoff is not a good source of garden water and that, along with the high cost, convinced us that it would not be a good solution.  Luckily, Mike found we could run a couple of elbows and have the gutter go right along the step up where the concrete connects to the deck.  This would be out of the way (no higher then the deck) and not cause any traffic issues in that transition.  It worked out great, though Mike wants to bend the elbows a little more to get a better seal.  That is for another time.

Added a few elbows and the gutter drain went right along the deck step
And right down the side, away from the patio
While he was outside working, Laurie asked Mike to hang the clothesline we brought from Gilbert.  It is a single line unit that is retractable and, in our other house, it was in the garage.  The only option we have here is outside and we felt it should be hidden.  We decided on the smaller side yard by the A/C unit.  Mike was able to attach the line to the side of the house and the hook was put on the fence.  This put it below the top of the fence and, since we have a wood fence on that side of the house, the line cannot be seen by our neighbors.

It was hard to see the line, so Laurie added some clothes for the picture
Other small tasks that Laurie had on Mike's list were hanging her Big Lots special outdoor chair and replacing her adjustable mirror in the master bath.  She found a smokin' deal on an egg-shaped hanging chair at Big Lots that just needed a tree branch and some chain to make it the perfect reading spot for her.  Laurie has always liked having an adjustable mirror on the wall to help do her hair and makeup and we found one at a garage sale for the Payson house a few years ago.  With the sale of the Gilbert house, we had brought up the nicer mirror she had there and Mike swapped the mirrors.  The garage sale mirror will find its way back to another garage sale.

Laurie's Big Lots chair, ready for some serious reading time
The mirror from our previous house looked better on the wall
One of the last tasks of the pellet stove install was to run the stove pipe through the wall to the outside.  Because our flooring in the great room will probably be replaced (with something other than carpet) in the not too distant future, we were not quite sure what to do about the carpet under the hearth as we didn't want the height of the hearth to change after we put the venting through the wall.  If we left the hearth on the carpet, our new flooring might not be as thick as the carpet and pad, so you would see the old carpet peeking out from under the hearth.  Why can't anything be easy!  So we finally decided to set the hearth directly on the subfloor.  This meant moving the stove and then the hearth (two awfully heavy items - great task for furniture sliders!) and then removing a section of carpet.  Mike had set down some tape along the outline before we moved everything and then cut near those lines.  He pulled up the old tack strips along the wall and placed them under the new carpet edge.  He did the best he could without tools to stretch the carpet onto the newly placed tack strips and we moved the hearth into place. It was a perfect fit.  The stove was moved back on top, ready to have its stovepipe installed.

This looks similar to other pictures, but now the hearth is on the sub-floor, not carpet
It has been over a year since we last cleaned the carpet and, though that may not seem long - especially since we were only part-time residents , having a dog like Zena means having to clean it often.  Not only does she shed a lot, but she drools and drips when she drinks water and the few times she has thrown up this past year, it was never on the tile.  So it needed another cleaning.  Laurie scheduled a guy to come over mid-week and we moved everything but the TV armoire, couch and hearth out of the room.  It took a couple of hours for him to do the carpet, hallway and the couch and then another half day while it all dried.  It was great having the opening between the deck and the concrete patio as we could easily get to the bedroom and master bath during the time we had to keep off the carpet.  It wasn't until after dark before we felt comfortable enough to walk around, and then only in stocking feet.

The last task Mike did before the guests arrived was to install a mirrored jewelry cabinet Laurie brought from the Gilbert house.  It fit great at the end of the short hallway leading to the guest bedroom.  In that space, the mirror works for Laurie to checking her attire or she can even do her hair/makeup if Mike is in the master bath.  It took just a couple of wall anchors (mollies) and screws to install. Now it just needs to be filled with jewelry.

A jewelry cabinet with mirror from our other house
After that there was some cleaning, furniture re-arranging, room setup and shopping to do.  It was now time for our visitors to arrive.  The 1st couple made it to the house by mid-afternoon on Friday and the 2nd couple arrived about an hour later.  Everyone got their luggage and food put away and we spent time talking and relaxing.  For dinner, each person made their own pizza which Mike cooked on the grill and we all sat outside on the new deck, the first time we had used it since it had been built.  We called it an early night and the next morning we had a wonderful breakfast casserole which was easy to pop into our small convection oven when the coffee got started. A little later we had sandwiches for lunch and then our peep shooting contest got underway (just for reference, this is using pellet guns to shoot marshmallow peeps for points).  In past years we shot right off the deck, but since the deck was now bigger, it was a shorter distance to the fence - not much of a challenge.  We moved the activity to the concrete patio with a straight line to the concrete slab next to the workshop.  We had a great time and the guys won the contest again this year.  The 1st game was a landslide, but only a few points separated the groups in the 2nd.  Dinner was hamburgers and sides, with a wonderful pineapple cake for dessert.  We taught the group a new card game (Nickels) before retiring for the night.  The next day we all piled into our truck and went up to Pine/Strawberry for the Labor Day craft fair.  We arrived before it got too crowded and hot.  Everyone found something of interest and we walked away with a few bags of goodies.  When we returned, both couples packed up for the trip back to the Valley and after a quick lunch out, we were on our own again.

The deck finally got setup for use, first time since it was installed
The new location for the peep targets
And the new location for the peep shooters
Shooters scoping out their peep prey
On Monday, Mike wanted to complete the pellet stove pipe installation so Laurie could have the town inspector review it during the week and get it signed off.  Now that the pellet stove and hearth were on their final resting place, Mike measured where the pipe would go through the wall and checked for studs and wiring.  We had previously reviewed the pictures taken prior to the drywall going up to see where the wiring was located and thought we would miss it.  To be sure, Mike bought a new stud finder that also does electrical scans, which helped us feel better that we were going to miss the wires. After all the markings, he started with a small hole just to feel inside and be sure there were no wires or stud.  Then he enlarged the hole for the thimble sleeve and cleaned out the insulation.  He found that the right side of the hole was right up against the stud, perfect placement!  Next he had to mark the center of the hole against the outside wall and drill a pilot hole.  On the outside, he used a string and pencil to draw a 7 inch diameter circle around the pilot hole and then cut out the hole.  It took a couple of attempts and some trimming to make the hole the right size for the thimble, but we finally got the thimble pieces (inside and out) installed.  We pushed the pipe through the thimble hole and attached the stove pipe to the side of the house.  We did not seal the finished product as we wanted to be sure the inspector would pass it, so Mike put tape around the outside thimble to keep any rain out.

Always scary cutting holes in the wall, but this one worked out
The thimble in wall, not the same as a thimble on your finger
The stove pipe connected through the thimble
The stove pipe on the outside of the house
Temporary seal with infamous duck tape
That brought an end to our wonderful relaxing and productive week.  Not everything on Mike's list was completed, but he made a good dent in it.

Stats: 7 Home Depot trips; 8 Walmart trips
Remodeling expense 8/04/15-9/07/15: $131
Remodeling expense to date: $51,624