This weekend we planned to lay the new plywood subfloor in the kitchen. Before we could start, we had to remove the back door to better understand what was causing the leak that damaged the sill boards. We want to replace the door anyway as it is pretty beat up and Matt found a large crack in the side jam when he replaced the door hardware. When Mike came up on Friday, he used the reciproating saw to cut the nails holding the door in place and we pulled out the whole door set. Between the open floor and the lack of a back door, we were very vulnerable to critters coming in the house. Luckily we had Zena to keep us safe.
 |
| Door and floor are gone - watch your step. |
On Saturday we started putting in the subfloor. The original subfloor was installed prior to the walls going up, so the edges were sandwiched between the floor joists and the walls. As a result, when we removed the flooring, we had to cut around the edges. Mike used the reciprocating saw again to trim away all the old wood as close to the walls as he could. Because the new subfloor would not be going under the walls, and, therefore, would not be resting on the outside joists, a new frame needed to be constructed next to the walls to support the new subfloor. Mike had an idea of how to construct the frame, but there were some issues with the joists that made him not quite 100% positive it would work and it was stressing him out a little. Our electrician/plumber/framing guy, Craig, has been letting us borrow his pneumatic tools over the weekend. I had to go to his house to pick up some nails for his nail gun and he mentioned that he was not doing anything at the time. I asked him if he'd like to help us with the frame. He was able to give Mike a few more options for the frame and, while Mike cut the supports, Craig nailed them in place. They finished in time for Craig to make his weekly hockey game at the local high school.
 |
| New floor frame in left corner of kitchen |
 |
| More of the floor frame on the right side of the room |
Mike and I then started cutting and laying the new 1 1/4" tongue and groove 4'x 8' sheets of plywood. We laid out a plan so the seams were offset from row to row, otherwise you end up with weak spots in the floor. The kitchen and dining area together is about 10' x 21', so we used four full sheets, two 4' x 5' pieces, two half sheets, and one 2' x 5' piece. Mike used the circular saw to cut off the tongue on the first row of plywood sheets that would butt up to the existing floor in the family room. Instead of regular nails or screws, Craig left us some special ring shanked nails (there are ridges on the nail for better gripping) that we could use to secure the floor with his nail gun. Bob had also told us that securing the floor with glue would make it less prone to squeak. We had to cut the wood, place them to make sure they fit, then remove them to put down the glue, then place them again and screw them in. These are REALLY heavy pieces of wood so I got my weight lifting exercise in this weekend. We were able to finish one row before calling it quits for the day.
 |
| Making the wood silent - cutting off its tongue |
 |
| First row of flooring completed |
Since we got finished with our work on Saturday after the gym closed, we needed to have a way to take a shower at the house. We still had the spigot that Craig put in the kitchen the previous weekend, but now the new flooring covered the area where the spigot had come through the floor so it was under the house. Mike decided to use one of our garden hoses to connect to the spigot and then he ran it under the house and through the window in the hall bathroom. We connected a standard hose sprayer to the end and moved our shower curtain to this tub. This gave us a make-shift shower, and even though we only had cold water, after working all day in the heat, it felt wonderful.
 |
| Hose for our shower |
We have seen a few spiders around the house since we started our work in July, but Craig told us this week he had seen a brown recluse in the crawlspace. Then we came home from getting something to eat Saturday night and found a huge spider on the ceiling. We were not sure if this was a brown recluse and found out later from some internet searching that is was a large crab spider, common to the northern area of Arziona. We decided it would be a good idea to bug bomb the crawlspace on Sunday after all our work is done. Since I was staying through the following week, I went to my dad's place in Chistopher Creek for the night.
 |
| Image appears larger in photo, but it was still big |
This past week, the workers also told us that there was still a lot of dog droppings in the crawlspace under the house. Matt had already made one sweep under the house the week after we started working, but he must have missed some areas. On Sunday, Mike got all his gear on to do another pass under the house. He cleaned up all the insulation that was laying on the ground and also removed a lot of garbage that was under the house. It is a very dirty job, maybe we should have called Mike Rowe to do it!
 |
| Before the job . . . . |
 |
| . . . and after |
The rest of the weekend was spent on finishing the flooring. The biggest snag we ran into was that the floor joists were not evenly spaced. Because the edge of each piece of subfloor has to be supported, we either had to cut the flooring or put in additional supports through the floor. We had to be careful not to cut too much of the flooring or we wouldn't have enough to finish the floor so we ended up adding a lot of extra 2x4s for support. The third row that went up next to the back wall was tough to cut because the walls are not square. We had to make some angle cuts on each piece, plus we had to make a cutout for the back door. However, we persevered and forced the last piece of flooring into place. After it was all done, the flooring was solid, looked beautiful and did not have any squeaks.
 |
| The last piece of the puzzle being placed |
 |
| Our new kitchen/dining room sub-floor |
At the end of the day, we covered up everything in the house in preparation for the bug bombs and I packed my bags for a night at my dad's place. We propped up the old back door into the opening just to keep out any animals and then Mike placed six bug bombs under the house and set them off. I took Zena and her dog crate to Christopher Creek, which is only about 20 minutes away from Payson. I needed her crate as my dad does not mind dogs, but not in the house. At night, I put her in her cage on the porch with some water and food. Just after I went to bed, I heard growling and banging outside. I found a large raccoon up in a tree next to the porch. I guess it must have been attracted to Zena's food and when Zena hit her cage trying to get at it, the racoon growled and ran up the tree. There were no more critter issues that night and the racoon was gone by morning.
 |
| Racoon way up high in the tree |
 |
| Closeup of the racoon - he/she was a cute critter |
Stats: 3 Home Depot trips; 1 Walmart trip
Remodeling expense 8/27-8/29: $2,335
Remodeling expense to date: $18,624