The original heating in the house was baseboard heaters in the main room and two bedrooms and then a wall heater in both the hall bath and master bedroom, many of which did not work. Based on the little information we learned of the building code in Payson, we knew we needed to have permanent heating in each of the living areas prior to getting our final inspection. Since the summer can get into the high 90s, we decided we also wanted air conditioning. We looked at many options, but found the least expensive was to use a wall a/c unit that provides heating too. We had everything laid out for this idea until we found out that the code also stated you had to have so many BTUs per square foot. Due to the size of the common room area, we would have needed at least three units which would have been expensive and taken up a lot of wall space. Our electrician told us about an a/c company in town that he had worked with. We met with them on Friday and, for not much more than all the wall units we would have had to buy, we were able to get a heat pump with a backup furnace and all the ductwork. We signed the paperwork and they will install the unit in the early part of September.
 |
| Bedroom baseboard heater |
|
 |
| Bedroom wall heater |
|
After our electrician/carpenter (Craig) re-framed our window for the light switch, Mike installed the new window we bought. This was the first time he had ever done this, but Craig gave him some good instructions and he and Matt were able to put it in on Friday without too much trouble. Because the new window was smaller than the old window, they also had to replace the siding. After carefully measuring for the door and window openings, they put it up and I painted it. This siding is a really rough texture and it is difficult to get the paint into all the crevices. To make things more difficult, the paint store tinted the primer and it turned out to be the same color as the regular paint when it is wet. Now that the paint has dried, there are all these little pin pricks of primer showing through. I think once we're finished remodeling, I'll rent a sprayer and just redo the entire house.
 |
| Setting in the window |
|
 |
| Waiting on dad |
|
 |
| Cutting the siding |
|
 |
| Perfect fit |
|
Saturday morning brought our first major scare with the remodeling project. After the drywall and panelling were removed in the kitchen area earlier in the week, Craig noticed that the beam in the kitchen entrance was not properly supported. This beam is where the original outside wall of the house was prior to the kitchen addition and supports the roof trusses. There were two studs on each end of the beam for support, but only one of the studs actually met the beam. Also, the same studs, and a few others on the kitchen end of the beam, had major holes drilled through them for what may have been plumbing pipes that no longer existed. This, combined with even more studs that had been completely cut off for other plumbing pipes, made this section of the wall very unstable. For safety, we propped the beam up with a few 2x4s until we could replace the bad boards. In the morning, Mike and I started pulling up tile in the kitchen until Matt woke up and could help with the framing work. Some of the tile was under the temporary supports, so we had to move them to get the tile out. Mike thought he could hold up the beam while I moved the temporary studs and pulled up the tile, but as soon as the 2x4s were removed, the beam started to drop as the studs that had been drilled through buckled. As I was frantically trying to put the 2x4s back in place without any success, Matt woke up and ran to the kitchen to help. He told us later that he when he woke and heard Mike screaming, he knew exactly what was happening and ran to the kitchen, praying the whole way. Praise God! The prayers worked and he helped me replace the temporary supports. We realized later that when we removed the drywall in the pantry on the back side of these cut studs, we took away the only thing that was keeping them from buckling. Drywall has some strength to it, but Craig felt that the wall would have eventually caved and this, among many other structural issues found, made us very thankful that we decided to remove the drywall.
 |
| Only one stud touches |
|
 |
| Not one real stud in this wall |
|
 |
| Hardly any support |
|
 |
| Buckled under weight of beam without drywall |
|
We realized we could not proceed until we felt more comfortable with the framing around the beam, so Matt and Mike tackled the job of replacing the studs. Adding more temporary studs along the beam, they were able to remove the original beam supports and put in two new studs on each end that actually supported the beam. They also replaced the other drilled out studs, but could not replace the studs that did not reach the floor because there were plumbing pipes in the way. That will have to wait until Craig re-routes the plumbing. The new framing looks great and we feel much better about the beam support.
 |
| All new studs |
|
 |
| New partial wall adds support |
|
While the guys were working on the beam, I started scraping up the tile near the pantry. These were the same type of peel and stick tiles we found under the carpet in one of the bedrooms. It is very tedious work as the tile cracks and breaks into little pieces, but I was able to get up all the tiles in this area for the work that needed to be done later.
 |
| Tile coming up in little pieces |
One of the things I've always wanted is a large pantry. Since we're completely redoing the kitchen, we decided to take out the existing small pantry and replace it with a much larger (4'x 8') one. Mike and Matt always groan whenever I say "I have an idea" because they know it means they will have to figure out how to take my idea and make it a reality. This is the first time either of them have done any major framing work and, I have to admit, I was a little nervous. However, it came out beautifully - even Craig was impressed! Mike gives all the credit to Google and the many experts online who have documented all the technical advice he has found. Part of the pantry expansion added even more support to the kitchen beam with an additional 2 foot wall.
 |
| One more wall to do |
|
 |
| Pantry framing completed |
|
The framing on the back kitchen wall was a mess and we wanted a better structure for when we put up our drywall and cabinets. We also needed better framing for moving the kitchen window to this back wall. Mike cut out all the bad framing with a reciprocating saw and then added new studs on this wall.
 |
| Changing back wall studs |
We decided to replace the existing pantry's flat door with the 6 panel door we were going to be removing from the gun cabinet in our bedroom. So just before Mike left for home Sunday afternoon, he and Matt decided to move it to the shed which previously had a very weathered door. This is an inside door so it probably won't last long, but it definitely was better than the one that was there and we eventually want to replace this shed so it should be a good temporary upgrade.
 |
| Old disgusting door |
|
 |
| New door for now |
|
Stats: 2 Home Depot trips; 1 Walmart trip
Remodeling expense 7/30-8/1: $4,679
Remodeling expense to date: $7,187